Stained Shaker cabinets, from setting out on site to completed cabinet installation. These photos show the cabinet work before countertops.
During installation
Setting out the base cabinets with a laser level.Fitting the tall panel to the ceiling.Levelling and securing the base cabinets.Fitting the wall cabinets and matching trim.
Cabinet installation complete
Doors and handles fitted. Cabinet installation complete, before countertops.