Stained Shaker wall and base cabinets installed, before countertops.

Stained Shaker cabinets, fitted on site

Stained Shaker cabinets, from setting out on site to completed cabinet installation. These photos show the cabinet work before countertops.

During installation

Base cabinets being positioned with a laser level during installation.
Setting out the base cabinets with a laser level.
Tall cabinet panel fitted to the ceiling.
Fitting the tall panel to the ceiling.
Open base cabinet with drawer runners and shims during fitting.
Levelling and securing the base cabinets.
Wall cabinet and matching trim during installation.
Fitting the wall cabinets and matching trim.

Cabinet installation complete

Stained Shaker cabinets with doors and handles installed, before countertops.
Doors and handles fitted. Cabinet installation complete, before countertops.

See more of our work

Back to blog